Environmental

Air Emissions Authorisation

In plain English
An Atmospheric Emission Licence (AEL) is required for listed activities that release emissions into the air, under the National Environmental Management: Air Quality Act 39 of 2004. Licensing is done by the metropolitan or district municipality acting as the licensing authority.
Advertisement

Who needs this permit

Operators of listed activities — furnaces, boilers above the listed thresholds, smelters, crematoria, asphalt plants, foundries, rendering plants and similar installations.

When is it required

Before the activity starts operating. A provisional AEL is typically issued for construction and commissioning, followed by the full licence.

Eligibility

  • The applicant is the person in control of the listed activity
  • The activity can meet the minimum emission standards for its category
  • Required environmental authorisations are in place or being processed

Documents you need before applying

  • Completed AEL application to the licensing authority
  • Description of the process, raw materials and emission points
  • Atmospheric impact report where required
  • Environmental authorisation (EIA) where the activity is listed under NEMA
  • Emission monitoring plan
  • Proof of public participation

Download a printable checklist

A one-page PDF of everything you need to bring with you. Tick items off before you go.

How to apply — step by step

  1. 1
    Confirm whether your activity is listed

    The listed activities and their minimum emission standards are published under the Air Quality Act. If your activity is not listed, an AEL is not required — but municipal by-laws on nuisance and dust may still apply.

  2. 2
    Appoint the specialists

    An air quality specialist prepares the atmospheric impact report and dispersion modelling in the format the licensing authority requires.

  3. 3
    Run the public participation process

    Interested and affected parties, including neighbours, must have an opportunity to comment.

  4. 4
    Submit the application and pay the processing fee

    The metropolitan or district municipality's air quality officer processes the application.

  5. 5
    Operate under licence conditions and report

    AELs carry monitoring, record-keeping and annual emissions reporting obligations via the National Atmospheric Emission Inventory System.

Where, how much, how long

Where to apply
The air quality officer at the metropolitan or district municipality where the installation is located.
Fees
Set by the licensing authority's tariff. Specialist studies usually cost far more than the licence fee.
Processing time
Several months. The Act sets processing timeframes, but specialist studies and public participation dominate the timeline.
Validity
Up to five years, after which review and renewal are required.
Renewal
Apply for review and renewal well before expiry, with updated emissions data.

Common mistakes to avoid

  • Commissioning a plant before the provisional AEL is issued
  • Skipping public participation, which invalidates the process
  • Under-reporting emission points
  • Missing annual reporting deadlines

Tips to speed up your application

  • Engage the municipal air quality officer early — pre-application meetings save months
  • Keep calibration records for monitoring equipment
  • Diarise the annual reporting deadline
Advertisement

Official sources

Always confirm the latest requirements and fees on the official website before applying.

Frequently asked questions

Related