Excavation Permit (Wayleave)
Who needs this permit
Contractors, plumbers, fibre installers, electricians and property owners who need to break ground in a road reserve, pavement or municipal servitude.
When is it required
Before any digging starts. Digging first and applying later normally attracts a penalty tariff and a stop-work order.
Eligibility
- You are the registered contractor or the property owner (or their appointed agent)
- You can produce public liability insurance
- You can supply a traffic accommodation plan where a road or pavement is affected
Documents you need before applying
- Completed way-leave / excavation application
- Site plan or locality sketch showing the exact trench position and dimensions
- Public liability insurance certificate
- Traffic accommodation plan (SARTSM-compliant) if traffic or pedestrians are affected
- Proof of existing services enquiry — municipal water, electricity, Telkom and gas line locations
- Reinstatement deposit or guarantee
Download a printable checklist
A one-page PDF of everything you need to bring with you. Tick items off before you go.
How to apply — step by step
- 1Do a services enquiry first
Ask the municipality and service providers for as-built drawings of buried services. Cutting a fibre trunk or a water main is expensive and the repair cost is billed to you.
- 2Submit the way-leave application
Apply at the roads or engineering department of your municipality with the site plan, insurance and traffic plan.
- 3Pay the fee and reinstatement deposit
The deposit covers the cost of the municipality repairing the surface if you don't reinstate it properly.
- 4Set up signage and barriers before breaking ground
Open trenches must be barricaded and lit at night. This is both a permit condition and an Occupational Health and Safety Act requirement.
- 5Reinstate the surface and request a final inspection
Backfill in layers, compact, and restore the tar, paving or kerb to the original standard. The deposit is only refunded after inspection.
Where, how much, how long
Common mistakes to avoid
- Starting work while the application is still being processed
- Ignoring the traffic accommodation plan requirement
- Reinstating with the wrong material, which forfeits the deposit
- Forgetting that a provincial road needs approval from the provincial roads authority or SANRAL, not the municipality
Tips to speed up your application
- Photograph the surface before you dig — it settles arguments about reinstatement standards
- Hand-dig the first metre where services are marked
- Keep the approved permit and traffic plan on site for inspectors